PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting Derrick -1 Facing South -2 (800x600).jpg Erecting Derrick -1 Facing South (800x600).jpg Erecting Derrick -1 Facing West (800x600).jpg Install rebar mats at Elev. 7-Stair -4,5  (800x600).jpg Moving the site fence past the site walk at Rahway Ave. Facing South (800x600).jpg Site Fence past the side walk Facing South-East (800x600).jpg Steel for Derrick -1 Facing South.jpg
Previous pageNext page Moving the site fence past the site walk at Rahway Ave. Facing South (800x600)
Moving the site fence past the site walk at Rahway Ave. Facing South (800x600)